from pallet on the drive to panels producing — the inspector passed it on the first visit.
Mark Delaney wanted the house bill down without handing the whole job to a contractor. The garage roof faced south and was low enough to work on safely.
Figures from the order, the gateway and the owner, checked with them in October 2026.
The Starter kit had everything for the roof. The 40-foot run to the house took a second cable kit, and the gateway shows output in the app.
Rails and feet on day one, panels and the inverter on day two; the inspector came the following Thursday.
The Starter kit ships with the guide, the wiring diagram and a permit pack drawn for your address.
Share a recent power bill and your address. An engineer sizes the system and emails a ready-to-checkout cart — like the one in this build.