Permits and Inspection: What to Send, and When

•1 min read
The permit pack in every order, the one-line diagram your utility asks for and how inspection day goes.
Sunbox engineer with a headset talking to a customer at her desk, roof layout on screen

Every Sunbox kit ships with a permit pack: a one-line electrical diagram, the panel and inverter spec sheets and a roof layout drawn for your address.

Before you order

Check whether your city wants a licensed electrician to make the final connection. Most Colorado cities allow homeowner installs on your own home with an electrician for the tie-in.

The utility

Your utility needs an interconnection application before the system goes live. The diagram in the pack is the one it asks for.

Inspection day

  • Labels on the isolators and the main panel — they ship in the kit.
  • Every rail grounded, every cable clipped.
  • The permit pack printed and on site.
Keep reading

More buying guides.

All Guides
Free parts list · one working day

Send us your roof. We’ll send the cart.

Share a recent power bill and your address. An engineer sizes the system and emails a ready-to-checkout cart.

Get My Parts List
Rather talk?

Engineers answer the phone, not a script.

+1-555-0168 · Mon–Sat 7–19hello@sunboxsupply.example